User and operator guide · Compliance

NIST Control Catalog

Status: currentReviewed: 2026-05-19Audience: security engineers, system owners, assessors, developers
On this pageHow To Use This CatalogStatus TaxonomyAuthoritative Artifact GateOperator Control LookupControl Evidence RecordControl Boundary ModelFamily SummaryAccess Control FamilyIdentification And Authentication FamilyAudit And Accountability FamilySystem And Communications Protection FamilySystem Integrity, Configuration, And Operational FamiliesNIST SP 800-207 Zero Trust CrosswalkNIST SP 800-63 Assurance MappingValidation Command MatrixEvidence Record FormatOpen Review ItemsRelated Pages
Important

This catalog is a structured engineering crosswalk for Atlas. It does not replace an SSP, SAP, SAR, POA&M, privacy assessment, inherited-control statement, or Authorizing Official decision. A control is only externally claimable when the deployed environment has current evidence, assessor review, and the required authorization artifacts.

How To Use This Catalog

Use this page to trace Atlas implementation responsibilities to selected NIST control families. Treat each row as a documentation starting point, not as a validation result:

  1. Confirm the system boundary and deployment profile.

  2. Verify whether the control is Atlas-owned, inherited, shared, or out of scope.

  3. Run make control-validation against the local-live Atlas platform or attach equivalent deployed-environment evidence through the catalog runner.

  4. Record residual risk and any POA&M item before promoting the row into an SSP or SAR.

Status Taxonomy

Status Meaning External-use rule

validated

The artifact-gated catalog runner completed every required validator for the control and found every required artifact in the current run.

May be cited as engineering validation evidence only. Deployed environments still need environment-specific artifacts and review.

failed

At least one required validator command failed against the selected platform.

Open a finding or POA&M item and preserve the failed run artifacts.

evidence-required

Validators are available, but a current artifact-gated run is missing required evidence.

Do not mark as passed until the missing artifacts are present and hashed in control-results.json.

inherited-pending

The Atlas portion may be testable, but full validation depends on hosting, network, enterprise IdP, PKI, SOC, assessor, or organizational evidence.

Do not mark as fully validated until inherited or external artifacts are attached and reviewed.

Authoritative Artifact Gate

The authoritative validation source is the machine-readable catalog and the generated run output:

make control-validation

The runner reads config/rmf/control-catalog.yaml, executes the required local-live validators, writes evidence under artifacts/rmf/evidence/<run-id>/, hashes every artifact, and emits control-results.json, control-results.adoc, and manifest.sha256.

Important

The rows below intentionally remain conservative. A row is not promoted to validated in this guide by hand. Use compliance:control-validation-results.html and the latest control-results.json to determine the current artifact-gated result.

Operator Control Lookup

Use these commands to validate and inspect a single control without reading the full catalog by hand:

make control-validation CONTROL_VALIDATION_ARGS='--control AC-3'

RUN_DIR="$(ls -1dt artifacts/rmf/evidence/* | head -1)"
jq -r '.controls[] | select(.id=="AC-3") |
  [.id, .title, .status, .boundary, .validation_mode, .reason] | @tsv' \
  "$RUN_DIR/control-results.json"
jq -r '.controls[] | select(.id=="AC-3") | .artifacts[]? |
  [.path, .sha256] | @tsv' "$RUN_DIR/control-results.json"

Expected outcome for an Atlas-owned passing control is validated with one or more hashed artifacts. A shared or inherited control may remain inherited-pending; that is not a validation failure, but it is also not a satisfied deployment control.

To list only controls that still need work:

jq -r '.controls[] | select(.status!="validated") |
  [
    .id,
    .status,
    (.missing_required_artifacts // [] | join(",")),
    (.missing_external_artifacts // [] | join(","))
  ] | @tsv' "$RUN_DIR/control-results.json"

Use the missing artifact columns as the evidence collection checklist. Required Atlas artifacts belong in the generated run directory. External artifacts belong under the catalog-defined external/<control-id>/ path for the run being reviewed.

Control Evidence Record

When transferring a catalog row into an SSP, SAR, or POA&M package, record the concrete evidence source rather than the prose row alone:

Record field Operator entry

Control and boundary

Control ID, title, and whether the row is Atlas-owned, shared, inherited, or external.

Validation command

Exact command used, such as make control-validation CONTROL_VALIDATION_ARGS='--control AC-3'.

Run directory

artifacts/rmf/evidence/<run-id>/ and the run_id value from control-results.json.

Status

Generated status from control-results.json, not a hand-edited guide status.

Artifacts

Artifact path, SHA-256 hash, timestamp, and command log path.

Claim boundary

What the run proves for Atlas and what remains deployment, inherited, or external.

Failure handling

Finding, POA&M, residual risk, external evidence request, or rerun action.

Control Boundary Model

Nist Control Boundary
Nist Control BoundaryArchitecture diagramOpen full size ↗

Family Summary

For assessor-facing implementation notes and evidence expectations, use the RMF family pages linked below. This catalog remains the cross-family inventory and validation taxonomy.

Family Atlas-owned surfaces Inherited or shared surfaces Primary validation

AC - Access Control

Gateway route guards, ABAC/policy, approvals, session revocation, application onboarding gates.

Enterprise group authority, network remote-access enforcement, mission owner approval process.

./scripts/validate-rmf-controls.sh --control AC-2, AC-7, AC-12; local-live and browser workflow tests.

AU - Audit and Accountability

Gateway audit events, authn audit trail, Merkle-backed audit integrity, frontend audit review.

SOC ingestion, SIEM retention, reviewer procedures, formal non-repudiation policy.

./scripts/validate-rmf-controls.sh --control AU-2, security validation, audit export evidence.

IA - Identification and Authentication

Password auth, MFA, WebAuthn, CAC/PIV local-live path, session assurance claims, refresh rotation.

Authoritative identity proofing, enterprise IdP account lifecycle, DoD PKI operations.

./scripts/validate-rmf-controls.sh --control IA-2, IA-2(1), browser-live tests, DoD PKI/FIPS readiness script.

SC - System and Communications Protection

TLS/mTLS configuration, GraphQL guardrails, session authenticity, key and secret references, encryption-at-rest support.

CMVP/FIPS module validation, enclave transport, hardware HSM operations, storage platform controls.

./scripts/validate-rmf-controls.sh --control SC-8, SC-28, ./scripts/check-dodpki-fips-readiness.sh.

SI - System and Information Integrity

Validation gates, dependency checks, vulnerability scan path, TrustAI anomaly signals, input guardrails.

Enterprise vulnerability management program, patch SLAs, SOC procedures.

./scripts/run-security-validation.sh, frontend XSS guardrails, TrustAI validation.

CM - Configuration Management

Versioned config, generated deployment manifests, claim-boundary checks, guide coverage checks.

Change-control board, production baselines, STIG tailoring, host hardening.

make guide-check, deployment validation scripts, release artifact checks.

IR - Incident Response

Incident response documentation, session revoke paths, audit review, and incident-supporting trust signals.

Organizational incident command, SOC process, reportability decision, and after-action review.

Operations runbooks, evidence bundle scripts, deployment validation.

CP - Contingency Planning

Backup/recovery documentation, backup integrity expectations, restore sequencing, and evidence packaging.

Backup platform, retention, restore drills, disaster recovery authority, and RTO/RPO approval.

Backup/recovery runbook, deployment storage evidence, and external restore artifacts.

RA - Risk Assessment

Security validation, dependency/security checks, generated findings evidence, and POA&M linkage.

Enterprise scanner, risk acceptance workflow, scan scope, and remediation SLA.

./scripts/run-security-validation.sh; scanner and POA&M evidence.

SA - System And Services Acquisition

Source-controlled changes, tests, validation scripts, guide checks, release artifacts, and attestations.

Supplier governance, change-control approval, release authority, and dependency review.

make guide-check, security validation, release artifact checks.

Access Control Family

Control Atlas responsibility Implementation statement Evidence and validation Status

AC-2 Account Management

Shared

Atlas identity and application-onboarding workflows expose account, assignment, group, lifecycle, approval, and review data. Enterprise account authorities and mission owner reviews remain deployment-specific.

scripts/validate-rmf-controls.sh --control AC-2; identity UI; approval queue; application access-review package.

evidence-required

AC-3 Access Enforcement

Atlas-owned for gateway paths

REST, GraphQL, WebSocket, policy, DDIL, settings, application onboarding, and identity routes are expected to pass through gateway/session/policy checks.

scripts/validate-rmf-controls.sh --control AC-3; gateway authorization evidence; protected-surface test output.

evidence-required

AC-6 Least Privilege

Shared

Operator mutations are separated from read/review paths; sensitive frontend controls require step-up, operator role, or workflow gate before mutation.

security:frontend-security-configuration.html; frontend/e2e/operator-workflows.spec.ts; GraphQL operator mutation checks.

evidence-required

AC-7 Unsuccessful Logon Attempts

Atlas-owned where Atlas authenticates directly

The RMF validator checks failed authentication events and whether high-rate failures are reflected in account status. Exact lockout parameters must be confirmed for the deployment.

scripts/validate-rmf-controls.sh --control AC-7; authn route tests; audit log evidence.

evidence-required

AC-12 Session Termination

Atlas-owned for Atlas sessions

Atlas tracks active, expired, idle, revoked, and denylisted sessions; dashboard/session controls expose revocation paths.

scripts/validate-rmf-controls.sh --control AC-12; session validation output; dashboard screenshots.

evidence-required

AC-17 Remote Access

Shared / inherited

Atlas can evaluate remote access context and session trust, but network VPN, enclave, and remote-access enforcement controls are inherited from deployment infrastructure.

ABAC policy config, gateway audit, deployment boundary documentation.

inherited-pending

Identification And Authentication Family

Control Atlas responsibility Implementation statement Evidence and validation Status

IA-2 Identification and Authentication

Atlas-owned for local authn; shared for federation

Atlas supports password authn, MFA, CAC/PIV local-live flow, OIDC/SAML federation exchange, JWT session issuance, and assurance claims.

scripts/validate-rmf-controls.sh --control IA-2; authentication bootstrap evidence; local-live validation evidence.

evidence-required

IA-2(1) MFA for Privileged Accounts

Atlas-owned for Atlas-managed MFA; shared for enterprise IdP MFA

Privileged operator mutations require assurance posture. The validator checks privileged-user MFA enrollment where the local database is authoritative.

scripts/validate-rmf-controls.sh --control 'IA-2(1)'; settings/policy mutation locks; WebAuthn/TOTP tests.

evidence-required

IA-2(8) Replay-Resistant Authentication

Atlas-owned for supported flows

Refresh rotation, JWT validation, session denylist, WebAuthn/FIDO2, and CAC/PIV local-live flows support replay-resistance objectives. Environment-specific key custody still matters.

JWT replay tests; WebAuthn tests; auth middleware tests; browser-live auth checks.

evidence-required

IA-2(12) PIV Credential Acceptance

Shared / inherited

Atlas has browser CAC/PIV local-live validation and PKI readiness checks, but operational DoD PKI trust, revocation availability, and issuer acceptance require deployment evidence.

./scripts/check-dodpki-fips-readiness.sh; CAC/PIV live validation; PKI configuration evidence.

inherited-pending

IA-5 Authenticator Management

Shared

Atlas contains password hashing, MFA device, WebAuthn, credential, and secret-reference paths. Enterprise credential lifecycle and hardware token issuance remain inherited or shared.

Authn unit/integration tests; Vault/secrets docs; identity credential UI.

evidence-required

IA-8 Non-Organizational Users

Shared

OIDC and SAML federation can represent external identity sources, but partner identity proofing and trust agreements are external evidence.

Federation route tests; local-live federation harness; external provider provenance.

inherited-pending

Audit And Accountability Family

Control Atlas responsibility Implementation statement Evidence and validation Status

AU-2 Event Logging

Atlas-owned for Atlas events

Atlas records authentication, authorization, DDIL, policy, workflow, and audit-review events where implemented by gateway and service code.

scripts/validate-rmf-controls.sh --control AU-2; Audit Review; security validation artifacts.

evidence-required

AU-3 Content of Audit Records

Atlas-owned for event schema

Audit event rows should include actor/user, action, resource, outcome, timestamp, and relevant trust/session context.

Audit page screenshot; gateway audit route code; authn audit trail.

evidence-required

AU-6 Audit Review, Analysis, And Reporting

Shared

The frontend audit page provides filtering and CSV export. Formal reviewer cadence, SOC escalation, and report approval are organizational.

Audit Review; operations monitoring and incident response pages.

evidence-required

AU-9 Protection Of Audit Information

Atlas-owned for tamper-evident authn trail; shared for storage

Atlas includes Merkle-backed audit integrity paths. Storage immutability, SIEM retention, and backup controls are deployment-specific.

Audit integrity validation; backup/storage evidence.

inherited-pending

AU-10 Non-Repudiation

Shared

Cryptographic audit evidence can support non-repudiation analysis, but formal non-repudiation policy and key custody are external.

Merkle audit evidence, signing key provenance, external evidence provenance.

inherited-pending

System And Communications Protection Family

Control Atlas responsibility Implementation statement Evidence and validation Status

SC-7 Boundary Protection

Shared

Atlas gateway is the browser-facing API boundary; deployment ingress, firewall, service mesh, and network segmentation are environment controls.

Deployment diagrams, gateway config, host-exposure checks, Kubernetes/Docker manifests.

inherited-pending

SC-8 Transmission Confidentiality And Integrity

Shared

Atlas development and local-live paths use HTTPS/TLS; backend and datastore TLS depend on deployment configuration.

scripts/validate-rmf-controls.sh --control SC-8; local-live validation; mTLS/SPIFFE docs.

evidence-required

SC-12 Cryptographic Key Establishment And Management

Shared

Atlas supports Vault and cluster key material workflows, but production key generation, custody, rotation, and HSM operation require environment evidence.

security:secrets-and-vault.html; deployment:cluster-key-material.html; Vault validation.

inherited-pending

SC-13 Cryptographic Protection

Shared

Repository readiness checks examine crypto posture, but they do not prove FIPS certification or CMVP module status.

./scripts/check-dodpki-fips-readiness.sh; crypto package tests; external module evidence.

inherited-pending

SC-23 Session Authenticity

Atlas-owned for Atlas sessions

JWT validation, refresh rotation, secure refresh-cookie flow, denylist checks, and memory-only frontend access tokens support session authenticity.

security:auth-session-hardening.html; frontend/e2e/auth-bootstrap.spec.ts; auth middleware tests.

evidence-required

SC-28 Protection Of Information At Rest

Shared

Atlas includes password hashing, field-encryption work, Vault/secrets integration, and encryption docs. Database/storage encryption requires deployment evidence.

scripts/validate-rmf-controls.sh --control SC-28; security:encryption-at-rest.html; database/storage evidence.

inherited-pending

System Integrity, Configuration, And Operational Families

Control Atlas responsibility Implementation statement Evidence and validation Status

SI-2 Flaw Remediation

Shared

Security validation runs dependency, vulnerability, and focused tests. Remediation SLAs and approval process are organizational.

./scripts/run-security-validation.sh; CI security workflow; POA&M template.

evidence-required

SI-4 System Monitoring

Shared

Atlas surfaces trust signals, anomaly events, DDIL state, audit events, and operational metrics. SOC monitoring and alert response are inherited/shared.

Dashboard, audit page, monitoring docs, Prometheus config.

inherited-pending

SI-10 Input Validation

Atlas-owned for app/API code

GraphQL request shape, frontend XSS guardrails, route validation, and service tests provide input-control evidence.

GraphQL guardrail validation; frontend guardrail output; security tests.

evidence-required

CM-2 Baseline Configuration

Shared

Guide, manifests, Docker/Kubernetes assets, and release artifacts describe intended baselines. Approved deployed baseline must be captured separately.

Deployment guide pages; generated artifacts; configuration manifests.

inherited-pending

CM-6 Configuration Settings

Shared

Atlas settings and config files are versioned and documented; secure values and environment-specific tailoring must be reviewed before deployment.

config/**; settings UI; deployment pages.

evidence-required

CM-7 Least Functionality

Shared

Host-exposure checks and deployment docs support reduced exposed services; production hardening remains environment-specific.

./scripts/check-host-exposed-services.sh; Docker/Kubernetes deployment docs.

inherited-pending

IR-4 Incident Handling

Shared

Atlas provides incident response documentation, session revoke paths, audit review, and threat/trust signals. Incident command is organizational.

operations:incident-response.html; dashboard and audit evidence.

inherited-pending

CP-9 / CP-10 Backup And Recovery

Shared / inherited

Atlas documents backup/recovery expectations, but storage, restore drills, retention, and disaster recovery authority are deployment controls.

operations:backup-recovery.html; deployment storage evidence.

inherited-pending

RA-5 Vulnerability Monitoring And Scanning

Shared

The security validation gate includes vulnerability/dependency scanning paths. Enterprise scanner, cadence, and acceptance workflow are external.

./scripts/run-security-validation.sh; CI security scan workflow.

inherited-pending

SA-10 Developer Configuration Management

Shared

Source-controlled changes, tests, validation scripts, and guide checks provide engineering evidence. Formal supplier/change-control approval is organizational.

CI workflows, tests, release artifact bundles, guide coverage check.

inherited-pending

NIST SP 800-207 Zero Trust Crosswalk

Zero Trust tenet Atlas implementation anchor Evidence Status

All data sources and computing services are resources.

Gateway treats sessions, policies, applications, DDIL queues, identity records, and audit events as protected resources.

Protected route tests, gateway route guards, frontend route inventory.

evidence-required

All communication is secured regardless of network location.

HTTPS gateway, local-live TLS, mTLS/SPIFFE preparation, and deployment TLS guidance.

Local-live validation, deployment docs, SPIFFE/mTLS page.

evidence-required

Access is granted per session.

JWT/session context, denylist, refresh rotation, AAL claims, session revocation.

Auth/session hardening page, auth middleware tests, session validation.

evidence-required

Access is determined by dynamic policy.

ABAC policy, trust-score context, DDIL state, operator assurance gates, approval workflows.

Policy page, ABAC config, TrustAI validation.

evidence-required

Enterprise monitors and measures asset posture.

Dashboard, audit review, DDIL status, monitoring configs, TrustAI signals.

Frontend screenshots, monitoring docs, DDIL live validation.

inherited-pending

Authentication and authorization are dynamic and strictly enforced.

Protected routes, fresh AAL2 mutation gates, CAC/PIV/federation paths, policy checks.

Operator workflow tests, browser-live tests, authn tests.

evidence-required

System collects information to improve security posture.

Audit events, TrustAI/anomaly signals, DDIL events, validation artifacts.

Security evidence map, audit review, TrustAI validation.

evidence-required

NIST SP 800-63 Assurance Mapping

Assurance area Atlas support Boundary

IAL

Identity records, registration/proofing screens, CAC/PIV attributes, federation subject context.

Authoritative identity proofing and IAL assertion require enterprise or deployment-specific evidence.

AAL1

Password authentication and JWT session issuance are supported for lower-assurance sessions.

Sensitive mutations should remain blocked or require step-up.

AAL2

MFA, WebAuthn/FIDO2, TOTP, CAC/PIV local-live flow, and frontend AAL2 mutation gates support AAL2-oriented workflows.

The deployed authenticator policy and enrollment evidence must be attached.

AAL3

Hardware-backed patterns may be represented by CAC/PIV/WebAuthn paths depending on deployment.

Atlas must not claim universal hardware-backed AAL3 without external authenticator, verifier, and policy evidence.

FAL

OIDC/SAML federation flows and session exchange are supported.

Federation assurance, IdP key custody, signing policies, and trust agreements are external/shared.

Validation Command Matrix

Command Controls it directly helps document Expected evidence

make control-validation

All controls listed in config/rmf/control-catalog.yaml

artifacts/rmf/evidence/<run-id>/control-results.json, control-results.adoc, and manifest.sha256

./scripts/validate-rmf-controls.sh

AC-2, AC-7, AC-12, IA-2, IA-2(1), AU-2, SC-8, SC-28 direct checks that feed the catalog runner

validation-report-<timestamp>.txt and validation-result.json under the active control-validation run

./scripts/run-security-validation.sh

SI-2, SI-10, RA-5, SC-13 readiness, frontend build/security guardrails, TrustAI validation

artifacts/security-validation/<timestamp>/

./scripts/run-local-live-validation.sh

IA-2, IA-2(12), SC-8, SC-23, AC-12, Federation/SSO, Lifecycle/SCIM, DDIL/Zero Trust behavior

artifacts/local-live-validation/<timestamp>/, including federation/phase1-.json and lifecycle/phase2-.json

cd frontend && ATLAS_BROWSER_BASE_URL=https://localhost:8443 npm run test:browser-live

Frontend auth/session bootstrap, protected surfaces, browser token-storage boundaries

Playwright browser-live output

./scripts/check-dodpki-fips-readiness.sh

IA-2(12), SC-12, SC-13 readiness language and evidence prerequisites

Readiness output plus external PKI/FIPS evidence when available

make guide-check

Documentation coverage, xrefs, Kroki rendering, claim-boundary language

Guide build output and coverage/claims pass lines

Evidence Record Format

Every control record promoted into an SSP, SAP, SAR, or POA&M should include:

Field Required content

Control ID

NIST family and identifier, including enhancement where relevant.

Boundary

Atlas-owned, inherited, shared, or not applicable.

Implementation statement

Specific implemented behavior, not aspirational posture.

Parameters

Timeouts, thresholds, roles, groups, retention period, or policy values used in the deployed environment.

Evidence

Artifact path, command, timestamp, hash when available, and collection operator.

Assessment method

Examine, interview, test, or a combination.

Result

Satisfied, other-than-satisfied, inherited, not applicable, or review-required.

Residual risk

Open risk, compensating controls, owner, due date, and POA&M reference.

Open Review Items

  • Convert deployed-environment control parameters into machine-readable evidence records before external review.

  • Separate Atlas-owned controls from hosting, enterprise IdP, PKI, SOC, and organizational inherited controls in the SSP.

  • Replace historical percentage-based compliance statements with control-by-control evidence.

  • Attach external evidence provenance before citing DoD PKI, FIPS, ATO, or third-party assessment claims.